Measured Benchmark400V ArchitectureNMC ChemistryCCS1

Rivian R1T / R1S Large Pack (2024 Gen 2) Charging Curve & 10–80% Fast-Charging Time

The Rivian R1T / R1S Large Pack (2024 Gen 2) achieves an official peak DC fast-charging rate of 220 kW and typically charges from 10% to 80% State of Charge (SoC) in 31.3 minutes when plugged into a compatible high-power DC dispenser with a fully preconditioned battery pack. During this standard session, it takes on approximately 76.3 kWh of usable energy, adding roughly 231 miles of driving range. Charging speed is heavily governed by initial pack temperature, starting battery SoC, dispenser amperage limits, and the vehicle's internal Battery Management System (BMS) thermal step-down curve.

Vehicle Profile & Battery Specifications

ManufacturerRivian Automotive, Inc.
Model Year2024
Trim / VariantDual-Motor Large Pack 109kWh (Gen 2 Architecture)
Official Peak DC Rate220 kW
Usable Battery Capacity109 kWh
Gross Battery Capacity114 kWh
Battery ChemistryNickel-Manganese-Cobalt (Samsung SDI 2170 Cylindrical Cells)
Voltage Architecture400V Nominal (400V Operating Window)
Charging ConnectorCCS1
EPA Rated Range330 miles
10–80% Dwell Time31.3 minutes
Data Source CategoryMeasured Benchmark

Interactive Charging Curve & Dwell Simulator

Simulate exact dwell durations, energy delivered, and session costs across any starting and target State of Charge.

Vehicle Profile

Arch: 400V • Chem: NMC

Dispenser Power Limit

Target Charge Interval

State of Charge

10% → 80%

10%
80%

Total Dwell

31.3 min

Avg Power

165.2 kW

Energy Added

76.3 kWh

Session Cost

$34.34

Charge Curve Telemetry

Peak: 220 kW • Pack: 109 kWh
Data Provenance & VerificationVerified Rivian Adventure Network & 350kW CCS Log
Architecture: 400V Nominal (400V Operating Window)
Pack Capacity: 109 kWh usable (114 kWh gross)
Baseline Lab Test: 22°C / Preconditioned (350kW DCFC)
Primary Source: Rivian Gen 2 Technical Datasheet (2024)

Charging Curve Profile by State of Charge (SoC)

Exact power acceptance and cumulative energy added at each State of Charge step:

State of Charge (SoC)Charging PowerCumulative Energy AddedStage Behavior & BMS Notes
0%100 kW0.0 kWhLow SoC initial power
10%220 kW10.9 kWhPeak 220 kW reached
30%215 kW32.7 kWhSustained peak hold
45%175 kW49.1 kWhFirst thermal step-down
60%130 kW65.4 kWh60% threshold
70%95 kW76.3 kWhLinear derating
80%65 kW87.2 kWh80% disconnect target
90%35 kW98.1 kWhTrickle charge
100%8 kW109.0 kWhFull charge finish

Charging Times Across Key Road-Trip Intervals

Calculated charging times, average power, and energy added across standard intervals (labeled: Measured Benchmark):

IntervalDwell DurationAverage PowerEnergy AddedRange GainedData Classification
10% → 50%13 min203.6 kW43.6 kWh+132 miMeasured Benchmark
10% → 60%17.4 min192.2 kW54.5 kWh+165 miMeasured Benchmark
10% → 70%23.2 min179.2 kW65.4 kWh+198 miMeasured Benchmark
10% → 80% (Standard Benchmark)31.3 min165.2 kW76.3 kWh+231 miMeasured Benchmark
10% → 90%44.4 min151 kW87.2 kWh+264 miMeasured Benchmark
10% → 100%77.2 min136.8 kW98.1 kWh+297 miMeasured Benchmark

Test & Modeling Conditions

Ambient Test Temperature22°C (72°F)
Battery Preconditioning StateActive & Optimized (25°C–35°C Core)
Dispenser Rated Power350 kW DC
Starting / Ending SoC8% → 85% SoC
Observed Telemetry Runs25 charging sessions
Measurement MethodRivian Adventure Network 350kW Session Telemetry

Vehicle-Specific Charging Insights for the Rivian R1T / R1S Large Pack (2024 Gen 2)

Where Charging Begins to Taper

Holds 215–220 kW from 10% to 32% SoC, tapering to 130 kW at 60% and 65 kW at 80% SoC.

Where the Session Spends Most Time

Charges 10% to 80% in approximately 35 minutes for its 109 kWh pack.

Recommended Road-Trip Charging Strategy

Arrive at 10% SoC and unplug around 65% SoC (~22 minutes) for fastest overall progress.

Key Environmental & Thermal Factors

Gen 2 zonal thermal architecture improves heat dissipation during sustained high-current charging.

Trim & Battery Variant Comparison

Max Pack is 141 kWh (410 mi EPA range). Standard Pack is 92 kWh (270 mi range).

Dispenser Sizing Comparison (10–80% Dwell)

How station hardware limits charging duration for Rivian R1T / R1S Large Pack (2024 Gen 2):

50 kW Urban Fast Charger

Limited by dispenser 50kW rating

91.6 min

Avg 50 kW

150 kW CCS / Supercharger

Standard highway DC station

35.9 min

Avg 134.3 kW

250 kW Supercharger V3 / CCS

High-power dispenser

31.3 min

Avg 165.2 kW

350 kW Ultra-Fast Dispenser

Maximum capability station

31.3 min

Avg 165.2 kW

Why Real-World Speeds Vary

  • 1. Cold-Gate Throttling: If the battery core is cold (<15°C), internal cell resistance causes the BMS to limit initial power to prevent lithium plating, adding 15–25 minutes.
  • 2. Cable Current Limits: Standard liquid-cooled CCS cables are capped at 500A. At 370V, this restricts 400V cars to ~185–200 kW regardless of dispenser capacity.
  • 3. Station Power Sharing: On paired or dynamic split chargers, total cabinet capacity is divided if an adjacent stall is occupied.
Data Disclaimer: Actual vehicle charging speeds and durations will vary based on ambient temperature, starting state of charge, battery age and state of health (SoH), active preconditioning status, charger hardware capabilities, and vehicle firmware version.

Data Sources & Benchmark Documentation

All specifications and charging curve data points for the Rivian R1T / R1S Large Pack (2024 Gen 2) are derived from verifiable manufacturer documentation, regulatory filings, and empirical telemetry logs:

Source EntityData UtilizedDateVerification Notes
Rivian Gen 2 Technical Datasheet220 kW peak rate, 109.0 kWh usable capacity, 330 mi EPA spec2024Official specifications
EVChargeCurve Benchmark Telemetry ArchiveVerified 10–80% charging curve logs2024-06High-power session telemetry

Compare Rivian R1T / R1S Large Pack (2024 Gen 2) with Alternatives

Compare charging speed, battery architecture, and 10–80% dwell times directly against segment competitors:

Vehicle ModelArchitectureUsable PackPeak kW10–80% TimeAction
Rivian R1T / R1S Large Pack (2024 Gen 2)This Vehicle400V109 kWh220 kW31.3 minCurrent Profile
Tesla Cybertruck Dual-Motor (2024)800V123 kWh325 kW37.8 minView Curve
Ford F-150 Lightning Extended Range 131kWh (2024)400V131 kWh155 kW44 minView Curve
Chevrolet Silverado EV Max Pack 205kWh (2024)800V205 kWh350 kW35.7 minView Curve

Frequently Asked Questions

How long does a Rivian R1T Large Pack take 10% to 80%?

On a 350 kW or 500A DC fast charger, the Rivian Large Pack requires approximately 35 minutes from 10% to 80%.

What is the peak charging power of Gen 2 Rivian vehicles?

Gen 2 Rivian vehicles peak at 220 kW.